Cementitious grouts, mortars, concretes and water seals - our expertise proven.


The standard in cementitious grout, mortar and concrete solutions for bridges and tunnels, infrastructure and buildings, coastal and flood defences.

Don't just take our word for it - we are unrivalled when it comes to technical expertise.

Our research and development team designs each product individually down to the last detail, meaning we can manufacture a bespoke solution or tweak and existing product to deliver the precise properties you require - be it setting speed, strength, workability or mix quality.
From pre-blended materials for concrete floor screeds to the most advanced tunnel grouts or high strength mortar products, we are committed to understanding your requirements and delivering the perfect product solution quickly.

Designing a bespoke compensation grout for  London's Crossrail Project

London
Image
Read the full case study

Designing a bespoke compensation grout for Crossrail, Europe’s largest and most challenging tunnelling project

Rapid strength cement for concrete bay replacement on A4232 Cardiff

Cardiff
Image
Read the full case study

The client needed to replace a number of concrete bay sections of the A4232, a busy stretch of dual carriageway connecting Cardiff Bay to the M4 motorway

Specialist grout for Preston sewage interceptor tunnel

Preston
Image
Read the full case study

In the £114m upgrade to existing sewerage systems, our regular bulk deliveries kept engineers supplied with tunnelling grout in the volumes they needed to complete the project on time.

Rapid strength cement for concrete road repair on the M42

Midlands
Image
Read the full case study

Highway engineers tasked with resurfacing Britain's first section of managed motorway turned to Pozament PQX Cement based concrete for rapid setting times and high final strengths.

Fast, efficient runway replacement at Birmingham International Airport 

Birmingham
Image
Read the full case study

PQX Cement was supplied for the use on the major taxiway maintenance project at Birmingham International Airport.

Ultra high strength grout for the Leadenhall building

London
Image
Read the full case study

The requirement was for a high performance product that could be supplied in large quantities, quickly and efficiently, to a busy area at the heart of central London.

High performance waterstop for the Naples Metro Underground Rail System

Naples, Italy
Image
Read the full case study

Extending the Naples Underground using Hydrotite CJ to protect the Naples Metrpolitana Underground from water ingress.

Rapid strength cement for rail bed replacement on London Underground

London
London Underground Modern Mix Cemrok
Read the full case study

The task facing London Underground was how to replace 3.2km of life-expired bullhead rail, timber sleepered, ballasted track in seven single-bore tunnels.

Rapid set grout for Glasgow Underground tunnel refurbishment

Glasgow
Glasgow Underground Set Accelerated Grout
Read the full case study

Modernising Glasgow's Subway tunnel to improve the network's supporting infrastructure and future-proof it against increases in passengers.

Development of specialist screed for The Shard

London
The Shard London
Read the full case study

Pozament used their specialist materials expertise to develop, test and supply a high-performance screed material for construction of The Shard, the tallest building in London.

Sulphate resisting grout for rail station redevelopment

Yorkshire
Image
Read the full case study

The experienced ground engineering contractor needed a proven construction grout for this planned rail station renovation and upgrade.

Marine Piling Grout for Ferry Terminal Upgrade

Liverpool
Image
Read the full case study

A high performance grout was needed to anchor piles for a landing stage and mooring, as part of a renovation and upgrade of the Isle of Man Ferry Terminal. Pozament Polymer Modified BC91P Grout provided the ideal solution.

High performance jointing grout for large office development

Leeds
Image
Read the full case study

This large commercial office development in Leeds needed a high-performance grout to finish the joints of the concrete supporting columns. Pozament CemThix high early strength jointing grout offered a fast, effective solution.

Get in touch
Our experienced technical team are available to advise on selection of materials to make sure our clients get right solution to meet the challenges of the site and achieve the best possible result.

Get a quote
First
Last
Email
Phone
Opt in
We would like to keep in contact with you about products and services we offer. If you wish to join our email list please tick the box to opt in.

Bespoke
grouts, mortars,
and concretes


Image
Developing custom designed material solutions for the most challenging projects and site conditions

Find out more