This flood protection project would replace and upgrade more than 600 metres of sea wall protecting the coastal town of Rhyl in North Wales. A high performance grout was needed for construction of new concrete stepped revetments. Pozament Platinum Rapid precision grout delivered rapid set times and early strength gain, enabling fast efficient progress within working windows.
Ultra High Strength Grout for construction of factory for wind turbines
This new factory on the banks of the River Tees needed a high-performance grout to support the steel frame. Pozament’s Ultra High Strength Construction Grout delivered the strength, precision and efficiency required.
Rapid replacement of concrete road on the A4232 in Cardiff
The client needed to replace a number of concrete bay sections of the A4232, a busy stretch of dual carriageway connecting Cardiff Bay to the M4 motorway.