A high performance grout was needed to anchor piles for a landing stage and mooring, as part of a renovation and upgrade of the Isle of Man Ferry Terminal. Pozament Polymer Modified BC91P Grout provided the ideal solution.
Designing a bespoke compensation grout for Crossrail
Designing a bespoke compensation grout for Crossrail, Europe’s largest and most challenging tunnelling project.
New London Underground Slab Track Cast In-Situ
The task facing London Underground was how to replace 3.2km of life-expired bullhead rail, timber sleepered, ballasted track in seven single-bore tunnels.
Naples Underground
Even with an exceptionally high water table and the nearby coastline, Hydrotite CJ ensured new tunnels and stations in the Napoli Metropolitana underground were protected from water ingress.