east-rhys-coastal-defence-scheme-

Rapid high strength grout engineered for demanding coastal defence applications

This flood protection project would replace and upgrade more than 600 metres of sea wall protecting the coastal town of Rhyl in North Wales. A high performance grout was needed for construction of new concrete stepped revetments. Pozament Platinum Rapid precision grout delivered rapid set times and early strength gain, enabling  fast efficient progress within working windows. 

High performance jointing grout for large office development

CEMTHIX  High performance jointing grout for large office development Aire Park, South Bank, LeedsBack to case study listClientVastintContractorMoortown GroupLocation typeOffice DevelopmentProject This large commercial office development in Leeds needed a high-performance grout to finish the joints of the concrete supporting columns. Pozament CemThix high early strength jointing grout offered a fast, effective solution. CHALLENGE This large project involved construction of 28,000 …

Marine Piling Grout for Ferry Terminal Upgrade Project

A high performance grout was needed to anchor piles for a landing stage and mooring, as part of a renovation and upgrade of the Isle of Man Ferry Terminal. Pozament Polymer Modified BC91P Grout provided the ideal solution.

Sulphate resisting grout for rail station redevelopment

Pozament GM Grout  Sulphate resisting grout for redevelopment of rail stationBridlington Rail Station  Back to case study listClientNetwork RailContractorVan ElleLocation typeRail stationProject The experienced ground engineering contractor needed a proven construction grout for this planned rail station renovation and upgrade. Pozament GM grout was chosen for its consistent flow and strength gain characteristics and sulphate resistance. The Challenge  A planned renovation …

  • Page 1 of 2
  • 1
  • 2