Sulphate resisting grout for rail station redevelopment

Pozament GM Grout  Sulphate resisting grout for redevelopment of rail stationBridlington Rail Station  Back to case study listClientNetwork RailContractorVan ElleLocation typeRail stationProject The experienced ground engineering contractor needed a proven construction grout for this planned rail station renovation and upgrade. Pozament GM grout was chosen for its consistent flow and strength gain characteristics and sulphate resistance. The Challenge  A planned renovation …

Birmingham International Airport

Tarmac Building Products supplied PQX Cement in June 2008 to the major taxiway maintenance project at Birmingham International Airport.

Preston Sewage Interceptor Tunnel

In the £114m upgrade to existing sewerage systems, our regular bulk deliveries kept engineers supplied with tunnelling grout in the volumes they needed to complete the project on time

M42 Concrete Bay Replacement

Highway engineers tasked with resurfacing Britain’s first section of managed motorway turned to Pozament PQX Cement based concrete for rapid setting times and high final strengths

Naples Underground

Even with an exceptionally high water table and the nearby coastline, Hydrotite CJ ensured new tunnels and stations in the Napoli Metropolitana underground were protected from water ingress.

The Leadenhall Building

Pozament have been providing our Ultra High Strength Construction Grout to London’s latest eye-catching skyscraper.

  • Page 1 of 2
  • 1
  • 2